MNC Bank in Fort, Mumbai

Problem:

  • Increased dead load on floor due to a server room for which it was not designed

Solution

  • Hot dip galvanized MS fabrication to create a false floor. Load transferred to the column capital.
  • Fabrication was carried out at workshop and final assembly by bolting was done at site due to working area constraints.

Overview

Heritage Building in Mumbai

Problem:

  • 75-year-old structure with marble slab facade. MS pins supporting the slabs had corroded, thus the slabs started falling

Solution:

  • Waterproofing of the facade and terrace
  • Corrosion repairs on the supporting RCC structure
  • Re-fixing of stone slabs using custom designed SS pins
  • Cleaning of the stones to restore the historic glory